LA Solar

For business

Solar solutions for business

Reduce energy costs and increase the energy resilience of your business with an individually engineered solar system.

LA Solar delivers the complete project package, from consumption study and engineering design to installation, monitoring and technical service.

Choose the solution by business goal

Grid-tied systems

Designed to reduce electricity costs. Especially effective for businesses with high daytime consumption.

Hybrid systems

Combine solar production with energy storage, keeping selected equipment running during outages.

Why solar matters for a business

  • Lower electricity costs The energy produced is used directly for your business needs, reducing consumption from the grid.
  • Predictable costs Your own generation reduces the impact of tariff changes on your business.
  • Efficient use of space An unused roof becomes an energy-producing space.
  • Sustainable growth Solar energy supports your company’s environmental goals and responsible positioning.

One team, one complete process

  1. 01

    Consumption analysis

    We study your annual consumption and future needs.

  2. 02

    Technical survey

    We measure the roof, shading and connection points.

  3. 03

    Design and calculation

    We calculate the capacity, annual production and cost.

  4. 04

    Equipment supply

    We supply LA Solar panels, Solis and Growatt inverters and BYD batteries.

  5. 05

    Licensed installation

    We carry out the installation, electrical connection, protection and grounding.

  6. 06

    Testing and commissioning

    We test the system and connect remote monitoring.

  7. 07

    Service

    We provide warranty and post-warranty service.

LA Solar combines manufacturing, design, installation and service in one complete process.

What’s included

Panels

16 × LA Solar 630 W, made in Armenia

01

Inverter

Growatt grid-tied (on-grid)

02

Mounting structure

Concrete mounting structure

03

Electrical

DC/AC cables, MC4 connectors, circuit breakers

04

Protection devices

Lightning protection system, protection box, grounding

05

Monitoring

Growatt ShinePhone app, 24/7

06

Installation work

Installation, connection, testing, commissioning

07

Paperwork

Documents prepared for Electric Networks of Armenia (ENA) to install a bidirectional (net) meter

08

Timeline

15–20 working days
  1. 1

    Contract and prepayment

  2. 2

    Site survey, final design

  3. 3

    Delivery

  4. 4

    Mounting structure and electrical installation

  5. 5

    Panel and inverter installation

  6. 6

    Testing and commissioning

  7. 7

    ENA: bidirectional meter

  8. 8

    Monitoring setup